Steg Footbridge, Rapperswil: railing gap in the bridge steel wall

← All projects

14

·

Landscape

·

Rapperswil

·

2016

·

Built

Steg Footbridge

Client

Municipality

Size

Span 40 m

Structure

Weathering steel, oak deck

Railing gap

6.00 × 1.50 m

Year

2016

Forty metres of oak and steel across a reed bed.

The bridge is as narrow as two people passing and as low as the reeds allow. The oak deck is laid in lengths one person can carry, so it can be repaired plank by plank.

We visit every finished building after the first winter and again after two years, and we publish what we would do differently.

Location

Rapperswil

Programme

Landscape

Main wall

Bridge steel

Status

Built

Railing gap

Railing gap, 6.00 × 1.50 m

Wall, Bridge steel

Wall · Bridge steel

Create a free website with Framer, the website builder loved by startups, designers and agencies.